Font Size: a A A

The Influences And Countermeasures To The Dalian Port's Throughput For The Blockage Of Shenda Highway

Posted on:2004-02-11Degree:MasterType:Thesis
Country:ChinaCandidate:Y H ChenFull Text:PDF
GTID:2156360092987525Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
The Shenda Highway is the main channel of Dalian to the inland. In order to cope with the increasing requirements of the Shenda Highway's runoff, the government decided to close off the road completely since Mar 2003.Because the Shenda Highway is always the important transport hinge which connects Dalian and the Northeast economic hinterland, after blockage the impacts to the Dalian port's turnoff of container are inevitable, so do the station of Dalian port in the Northeast logistics layout and the competitive environments of the surrounding ports.This issue takes the influences on the Dalian Port container's runoff for the Blockage of Shenda Highway as the center, makes some forecast for the turnoff, analyzes the competitive environment to the surrounding ports, and brings forward some suggestions. It's sure this issue could table some feasible references (proposals) for Dalian port's making the development strategy, consigneers'choosing the transport routes and DPC establishing the company's programming.
Keywords/Search Tags:The Blockage of Shenda Highway, The Container Liner, Comparison of Cost
PDF Full Text Request
Related items