Font Size: a A A

Yuan Zigou Mine Construction Optimization

Posted on:2014-01-11Degree:MasterType:Thesis
Country:ChinaCandidate:X L TengFull Text:PDF
GTID:2181330467466569Subject:Mining engineering
Abstract/Summary:PDF Full Text Request
There are many uncertain factors in the process of construction of coal mines,including long construction period, high investment, complex internal management,participate in many units and work great. Therefore, the mine constructionorganization optimization work in mine construction plays an important guiding role,it has the dual role of strategic and tactical arrangements. And embodies the basicconstruction plan and design request, provides the various stages of constructionpreparation work’s content. Coordinate in the construction process of the constructionunit, the construction work, the relationship and the various resources.In this paper, Yuan Zigou mine, for example, combined with the actual situationof the mine construction, and mine safety management in implementing the basis ofdocuments, with scientific methods and means, from the analysis of the maincontradiction to start mine construction. Focusing on the building program,construction period, construction plan, the wellbore through, pressure air system,wellbore change cutter, shaft equipment and other works for a reasonable analysis.Closely with actual and outstanding economic efficiency under the premise of minefor a number of key points to optimize the construction program, and proposed theconstruction of the overall optimization of mine.Through this research project, the construction period will effectively enhancethe synergy between the various construction units, integrity, in order to improvework efficiency and construction management level, improve investment returns havegreater practical significance.
Keywords/Search Tags:mine construction, Optimization of Construction Organization, Wellbore through, Wellbore change cutter, Shaft equipment
PDF Full Text Request
Related items