Font Size: a A A

Research On Cost Management Of Panlong Oil Production Plant Of Intermittent Pumping Energy Saving Project Design Stage

Posted on:2015-11-14Degree:MasterType:Thesis
Country:ChinaCandidate:S T HongFull Text:PDF
GTID:2181330467488538Subject:Project management
Abstract/Summary:PDF Full Text Request
In the increasingly competitive international environment, panlong production plant isonly consideirng the change of domestic and foreign environment quickly and adjust to themethod of cost management, reasonable and effective to reduce the cost, can be in animpregnable position. For a large number of low pressure, low permeability, low pow, toimprove the well economic beneift by intermittent pumping is an effective method. Panlongproduction plant was observed through the investigation and study and practice theintermittent pumping cost control has many deficiencies, intermittent pumping cost conceptconsciousness weak, the intermittent pumping cost management level is not form a systemextensively, didn’t get the reasonable use of advanced technology, this article is in view of theproblems in the research the most suitable panlong production plant is intermittent pumpingenergy conservation project design phase cost management solution.This paper dragons playing intermittent pumping energy saving project as the researchobject, using the related theory, cost management and control method for oil panlongintermittent pumping energy saving project cost management problems existing in the study,through the objective analysis of the intermittent pumping project model of energyconservation^cost structure, the influencing factors of cost, project design phase costmanagement present situation, through in-depth analysis, put forward panlong productionplant is intermittent pumping energy conservation project design phase cost managementmeasures, and gives the panlong production plant is intermittent pumping energy conservationproject design phase cost management implementation of security advice,To seek a morescientific and effective intermittent pumping energy saving project design phase cost controlguarantee mechanism and management system, for the panlong production cost control,improve management ability and sustainable development ability, laid the foundation of theoryand practice.
Keywords/Search Tags:intermittent energy-saving projects, cast management, the design phase
PDF Full Text Request
Related items