Font Size: a A A

Research On Installation Engineering Project Management Of Large Steam Drying Machine

Posted on:2016-04-20Degree:MasterType:Thesis
Country:ChinaCandidate:H F YangFull Text:PDF
GTID:2191330479951283Subject:Project management
Abstract/Summary:PDF Full Text Request
Copper concentrate steam drying machine is one of the core equipment of copper flash smelting technology, the equipment and ancillary system installation to strict management, technical difficulty is big, is the typical cases of mechanical and electrical installation project, only a handful of domestic nonferrous metallurgical construction company of mechanical and electrical installation project construction of the device.By studying the equipment installation engineering project management, extended to the study of construction project management of electromechanical installation enterprise, is the gansu TongCheng engineering construction co., LTD., comprehensive management and technology test and challenge, is the gansu province construction and installation company to undertake large-scale mechanical and electrical equipment installation engineering and project management innovation and development of beneficial attempt.Combining with the author on the working experience in gansu TongCheng engineering construction co., LTD. And the project management practice, according to the project management theory and system theory and other related knowledge, studies the large-scale steam drying machine installation project management characteristic and the present situation, project management, project management, project construction organization, etc., to explore and establish the conform to the mechanical and electrical installation of specialized contracting enterprise construction project management mode, the analysis of project management in mechanical and electrical equipment installation engineering technology main points, set up to adapt to the market economy rule of the internal market, effectively promote the project management to realize the expected goal, effectively reduce the project cost, improve the comprehensive benefit of the project.Gansu TongCheng engineering construction co., LTD. Has obtained the good effect after implementation of the construction project management:(1) To promote the concept of change, the company implements the construction project management mode, to promote the enterprise management and the general member under the concept of change, to adapt to the fierce market competition;(2) Reduce the project cost, improve the economic benefit and labor efficiency, and ensure that the expected goal of the project, the installation improves the staff enthusiasm, improve the profit of a company and the project department, employees’ income income increase;(3) To ensure the engineering quality, by the customer trust and departments at all levels of approval and recognition, has obtained the good social reputation and economic benefits;(4) Improved the health of the project installation, environment, safety management consciousness and management level;(5) Inspired the enterprise and the staff enthusiasm, improve the company’s job responsibility management and performance evaluation system, promote the team worker staff comprehensive quality of ascension;(6) According to the market principles and indenture system, the establishment of enterprise internal market, the efficient allocation of production factors, clarify the relationship between the company and the project department, the implementation of the project department QuanZe Li subject relations;In this paper, for the domestic copper smelting enterprises and to undertake largescale steam drying installation project construction enterprise, in project management and provides reference in the practice of operating mode.
Keywords/Search Tags:Steam Drier, Installation Engineering, Project Management, Model Research
PDF Full Text Request
Related items