Font Size: a A A

Government Process Reengineering Risk Identification And Assessment Study

Posted on:2010-05-15Degree:MasterType:Thesis
Country:ChinaCandidate:X YangFull Text:PDF
GTID:2206360275983073Subject:Administrative Management
Abstract/Summary:PDF Full Text Request
Government Process Re-engineering has brought new areas of public administration a profound revolution, but its relatively high failure rate has discouraged many organizations. Government Process Re-engineering in the introduction of risk management, the use of correlation method to identify and assess the risks involved will help the Government improve the success rate of GPR in order to further reduce the implementation costs, improve work efficiency.In this paper, by analyzing the related research, find out the importance of risk management in the Government Process Re-engineering . Government Process Re-engineering through the analysis formation reasons of the risk, based on the risk identification methods, content, principles, procedures, and Government Process Re-engineering characteristics of the stage, the classification structure analysis method combined with the flow to the Government Process Re-engineering of the six stages listed vector, Process Re-engineering the process of organization, personnel, environmental, technical risk is characterized by four row vector, the composition of risk identification matrix, to identify the detailed Government Process Re-engineering risk items, and then based on the risk of non-repetition principle, and describes the risk list.According to the list of risks identified and using AHP(Analytical Hierarchy Process) mothered constructed a risk hierarchy model of Government Process Re-engineering. Further more, compared through each two elements come to the five judging matrix, through the calculation of exigent values, as well as the test of consistency, get the Government Process Re-engineering risk weight, which sort of risk.Finally, put the risk identification and assessment methods in a government department of the Government Process Re-engineering to verify the feasibility of the conclusions in this article.
Keywords/Search Tags:Government Process Re-engineering(GPR), risk, risk identification, risk assessment
PDF Full Text Request
Related items