| Cementing operation is a key link of drilling and completion, construction quality directlyaffect the exploration of oil and gas, effects of oilfield development benefits, so the oil attachedgreat importance to the issue of the construction and the cementing quality, and how to improve thecementing quality to carry out a large number of research in this field, features and conditionssummarized a series of effective technology measures, and laid a solid foundation for ensuringcementing quality. A large number of theoretical research results and cementing practice resultsshow that, in the borehole condition specific and basic premise of cement slurry system the rightchoice, pressure stability and for the net is the most crucial factor for cementing quality construction.Therefore, in order to guarantee the construction quality, in addition to develop construction ofscientific and rational design, construction scheme should be reasonable, with rapid resolution ofemergency plan, the construction of emergency at the same time, more important should alsoprovide construction monitoring technology, which can realize the implementation of technicalparameters of the monitoring and control adjustment the series of supporting measures in theconstruction process. Therefore, the project around the center, with daily workload of developmentwells, adjustment well cementing construction as the object, to carry out research and developmentwork cementing design and construction management system software. |