Chemical Equipment Tendering And Bidding Management Program

Posted on:2017-04-17Degree:MasterType:Thesis
Country:ChinaCandidate:H X PengFull Text:PDF
GTID:2336330512462460Subject:Chemical engineering
Abstract/Summary:PDF Full Text Request
In recent years,around the chemical construction projects,chemical equipment bidding management implementation is imperative.Compared with western developed countries,the chemical equipment tendering and bidding management coverage rate is relatively low,the operation standard,is not enough collusion,false bidding,bribe behavior occurs frequently,such as bidding and reveal the pre-tender estimate tendering seriously affected the market order,restrict the healthy development of the bidding work.Investigate its reason,mainly is the lack of system of bidding and tendering management system in our country and the absence of regulation.For integration into the global economic integration,must adapt to the globalization,the use of globalization.At the same time,in order to strengthen the government macroeconomic regulation and control,standardize the market order,saving the state-owned capital and intensify anti-corruption,must further perfect our country's chemical equipment tendering and bidding management procedures.Legislators and policymakers should stand in the height to increase the competitiveness of bidding and tendering market in China,from the perspective of the functions of strengthening the management of bidding and tendering,perfect the supervision,to speed up the management innovation.This topic in the company chemical plant in tendering and bidding management procedure as the research object,according to the analysis of existing problems in the process of bidding,detailed discuss one improvement and improve the countermeasures of these problems and compiled a set of pre-qualification selection procedure,the assessment,the working procedure were further standardized.In view of the national investment project,entrust a procuratorial agency for invite tenders.Before the start of civil engineering,installation,anti-corrosion engineering in the tender,good budget ahead of time,accomplish know fairly well,making an inquiry,prior to the start of the procurement project in the tender co.,reduce the cost and save money.Challenge system for bidding and tendering management regulations,at the same time,improve the judge the integrity of system,challenge system,assessment of the bid assessment committee and intermediary management system,to prevent and curb corruption breeding,ensure openness and fairness of the bidding work.
Keywords/Search Tags:Chemical plant, the pre-qualification, bid evaluation scaling, invite tenders, intermediary, commissioned bidding, challenge system, system of integrity
PDF Full Text Request
Related items