| Oil and gas,as the non-renewable resource,play more and more important role in the security and stability of national economic development.The development and construction of Oil and gas fields are the key foundation of the industry.So how to maximize the efficiency of oil and gas field construction and operation etc.has become the focus of oil industry.At present,oil & gas field construction project post-evaluation is paid more and more attention.The project post-evaluation can summarize and analyze the major aspect of oilfield construction project,such as project setting-up,project construction,production and management,social impact and project sustainability,providing a general evaluation to the project,summarize the experience and lessons,produce improvement advice for future projects.This article is the post-evaluation of M area facility construction project.It introduces the research result and trend of the project post-evaluation,elaborates the concept of post-evaluation,characteristics,basic principles,evaluation methods etc.The article focuses on the development process of the M area,economic benefit,impact and sustainability.The post-evaluation of the project in the M well area,guiding by the post-evaluation theory,collects the actual development and construction data,sums up the qualitative and quantitative analysis.The productive advice summarized in this project,in particular,the key method of saving construction investment,is of great value for the subsequent development of oilfield. |