| Offshore oil engineering project,compared with other industries project item has its uniqueness,its comprehensive,more complexity and contains various types of production equipment,facing the harsh field environment and climate,these factors on the offshore oil engineering construction has the important influence,of all kinds of equipment installed in the project at run time will have a high temperature and high pressure,inflammable and explosive,such as the occurrence of various risks,which requires the offshore oil engineering in construction process must strictly abide by the standards set by the government,the third party rules,and regulations,prevent the happening of the quality and safety accident event.At the same time,offshore oil engineering involves a wide range of professional.In addition,offshore oil engineering projects include various majors such as petroleum and petrochemical,with a large number of contractors and more supervision requirements from the owners and the third party,which to some extent puts forward higher requirements on the professional knowledge of project managers and quality supervision and management personnel.Starting from the basic theory of quality management,this paper has sorted out the relevant theories on the quality optimization of newly added blocks and offshore installation projects in luda oilfield,analyzed the quality management of newly added blocks and offshore installation projects in luda oilfield,and put forward corresponding solutions.By analyzing the quality management status of newly added blocks and offshore installation projects in luda oilfield,the existing problems in the quality management of newly added blocks and offshore installation projects in luda oilfield are found out,and the causes of these problems are analyzed.Under the guidance of related theories of modern project management,the optimization scheme and countermeasures are put forward to solve the existing problems.To study and put forward the operation guarantee measures and methods of the application optimization scheme.Brigade new block large oilfields offshore installation and project quality management optimization is to meet the requirements of total quality management and the development trend,fully tap the problems existing in the quality management and put forward countermeasures,one by one so as to improve the quality of the project,reduce the probability of project quality defects,reduce the uncertainty of production and construction,and achieve the strategic goals of the enterprise.Based on this management idea,advanced quality management concept is adopted to optimize the quality management of the project.It is of great significance to realize the efficient operation of the project through optimization,enhance the core competitiveness of the enterprise,increase the income of the enterprise and improve the competitiveness of the enterprise. |