Font Size: a A A

Research On Schedule Planning And Control Of Desulfurization And Denitration New Project In Baosteel

Posted on:2018-03-30Degree:MasterType:Thesis
Country:ChinaCandidate:M Y TuFull Text:PDF
GTID:2481306047953199Subject:Project management
Abstract/Summary:PDF Full Text Request
The production of iron and steel industry as an important sector of the national economy,affected by macroeconomic and steel industry demand,many steel mills face meager profit or loss,the environmental pressure has become a bottleneck in the development of iron and steel enterprises in china.Baosteel is the largest and most modern steel enterprise with the highest degree of modernization and comprehensive competitiveness in China.At the same time as the domestic steel industry leader in energy saving and environmental protection,Baosteel adhere to the green manufacturing,take the road of sustainable development.In recent years,Baosteel in a series of energy conservation,environmental protection and resource recycling technology research and continuous progress in the field of industrialization.Sulfur dioxide and nitrogen oxides are the main sources of air pollutants in iron and steel production,which bring serious harm to the ecological environment.This project is a project of Baosteel coke oven overhaul project,plans to build two sets of flue gas purification device,combustion flue gas generated on the new coke oven desulfurization,denitrification,denitrification of flue gas heat exchanger and reduce the operation cost of the system.The new environmental protection project is imminent,how to use the progress management ideas and related technology,improve management efficiency,to solve the existing environmental protection equipment defects,so as to achieve pollutant emissions,improve the degree of automation is a topic worthy of further study.This paper mainly discusses the research background and significance on schedule plan and control of the Baosteel coking desulfurization denitration project,application of project planning and control theory,combined with the reality of the Baosteel projec,carry out the coke desulfurization denitration project progress plan,and force compressed schedule,optimize logic relationship to follow-up rapidly.At the same time,through the construction of the control system,the timely adjustment of the schedule deviation and the security measures in the aspects of organization,technology,economy and management are taken.,futher strengthen the project schedule control,improve management efficiency.To ensure that the project can meet its time constraints to achieve its overall goal,to promote the traditional iron and steel manufacturing environmental protection level of progress for the entire industry to make an important contribution to the sustainable development.
Keywords/Search Tags:environmental pressure, desulfurization denitration projects, schedule, schedule control
PDF Full Text Request
Related items