Research On Schedule Management Of Anti-counterfeiting System Development Project Of Baosteel Color Coated Sheet

Posted on:2020-04-10Degree:MasterType:Thesis
Country:ChinaCandidate:H M ChenFull Text:PDF
GTID:2481306353953479Subject:Project management
Abstract/Summary:PDF Full Text Request
Baosteel color coated sheet has established the competitive advantage in the domestic high-end market because its quality,brand,and systematic service.However,there exist counterfeit Baosteel color coated sheet in the market,which is detrimental to clients' interests and Baosteel's reputation.To eliminate the counterfeit products an anti-counterfeiting system is proposed.By the use of dimensional bar code,all the product information of Baosteel color coated sheet is traceable.The system is required to be put into operational in a limited time.It is urgent to use the project management method to establish a comprehensive project schedule and implementation promotion system.Thus to carry out all-round and whole-process management of the project,and ensure the scientific and effective project completion as scheduled.Using the method and theory of project schedule management,this paper takes schedule management of anti-counterfeiting system development project of Baosteel color coated sheet as the research object.In this research,the relative literature of project progress management is surveyed,the current research,research trend,and classical project progress management methods are identified.The background and significance of anti-counterfeiting label development project of Baosteel color coated sheet are introduced.The critical path of this project is determined in the project network diagram,and then improved by the use of task duration reduction.Finally,the baseline of project and project progress supervision,control,and assurance measures are proposed.The dynamic monitoring mechanism and the progress deviation correction mechanism were formulated to insure project implementation.The dimensional code printing at the end of the production line is the first time at home and abroad.At the same time,the Baosteel color coating unit runs very fast,the technology is very complicated.The anti-counterfeiting system development project involves a large scope and many participates.After the completion,it will not affect the normal operation of the color coating production line.The above factors are all directly impact on the project design and smooth implementation.The results of this research guarantees the implementation of anti-counterfeiting System development project of Baosteel color coated sheet,enrich the research of project progress management and can be used as a reference for similar projects.
Keywords/Search Tags:Schedule plan, Schedule control, Network plan, Critical path method
PDF Full Text Request
Related items