| Gradually fall to the ground with the second batch of demonstration projects,local government,the social capital,consultancy experience accumulated,and about franchising,government guide fund,replace subsidies with awards and other related policies and regulations,perfecting the PPP model will have wide development space.Sunrise FH sewage treatment plant in this paper,combining with the actual project,the PPP financing first expounds the related theory about the PPP project financing at home and abroad and the latest research results,on the basis of theory combined with actual project,analyses the sunrise as far as the project initiated by the company water company basic operation situation,and gives the PPP project financing has advantages and disadvantages.After sunrise FH sewage treatment plants in order to adequately address the PPP project of actual financial difficulties,design three kinds of practical feasibility of financing,and use the analytic hierarchy process(AHP)was carried out on three kinds of financing options evaluation and selection,and ultimately chose the sewage treatment plant of future profit oriented policy bank financing,the main conclusions of this paper is as follows:Firstly,this paper analyzes the sunrise as far as water as a PPP project initiated by the company’s main financial indicators of the company,find the problems existing in the operation,and it has disadvantages of financing;And then Sunrise FH for waste water treatment plant of the actual situation of the PPP project financing facing design three kinds of feasible financing scheme,namely the self-built fund mode financing scheme,citic built for financing and sewage treatment plant of future profit oriented policy bank financing plan;Finanlly analytic hierarchy process was used to evaluate and select three alternative methods.Set up two layers of evaluation index system,give full consideration to the speed of financing cost and financing risk,financing and financing feasibility effect on the performance of three schemes,and ultimately chose the sewage treatment plant of future profit oriented policy bank financing options.Has done the related work and the corresponding conclusions and help chaoyang as far as water company in the PPP project financing and the scientific management in the course of the construction of the PPP project as a whole,more is worthy of reference for other similar PPP project management company to solve their financing difficulties. |