Font Size: a A A
Keyword [Oil-gas-water]
Result: 1 - 20 | Page: 1 of 4
1. Study On Oil, Gas, Water Three-phase Displacement Mechanism And Numerical Simulation Of The Volcanic-Rock Fractured Bottom-Water Reservoir
2. The Limit Confirming And Hydraulic/Thermodynamic Calculation Method Research For Oil-gas-water Mixing Transportation Safe In Pipeline During Oil Producing With Supper High Water Cut
3. Investigation On Hydrodynamic Characteristics Of Two-Phase And Oil-Gas-Water Three-Phase Slug Flow
4. The Testing Study Of Temperature Limit And Pressure Drop For Oil-gas-water Mixed Transportation During Extracting Oil Of Highly-Watery
5. Research And Control Of Oil Gas Water Three Phase Facility
6. The Calculating Methods And Application Of The Oil-gas-water Multiphase Flow
7. The Flow Pattern And Pressure Drop Testing Research For Oil-gas-water During Oil Producing With Supper High Water-Cut
8. The Limit Confirming And Hydraulic/Thermodynamic Calculation Method Research For Oil-gas-water Mixing Transportation Safe In Pipeline During Oil Producing With Supper High Water Cut
9. The Study Of Oil/gas/water Separation With High Efficient Separator
10. Numerical And Experimental Investigation On Oil-Gas-Water Three Phase Flow In Horizontal Straight Tubes
11. Research On Flow Characteristics Of The Oil-gas-water Three-Phase In Vertical Wellbores
12. Research Of Oil-gas-water Three Phase Flow Data Characteristic
13. The Design Of Experimental Data Acquisition System About Oil-Gas-Water Multiphase Flow
14. Study On Temperature Limit And Energy Saving Technology Of Circular Gathering And Transferring Process In Oil Field
15. Research On Numerical Simulation And Gas Holdup Measurement Of Upward Oil-Gas-Water Three-Phase Flow
16. Study On Pressure Drop Calculation Of Transmission Line With Mixed Oil-gas-water Three-phase Flow
17. Research On The Flow Field Of The Three-Phase Separator For Oil/Gas/Water
18. Research On The Flow-rate Measurement System Of Oil-gas-water Three-phase Flow Based On LMS Adaptive Time Delay Estimation And ARM
19. The LMS Time Delay Estimation Algorithm Research Based On Maximum Likelihood And The DSP Implementation
20. Oil And Gas Wells Efficient Milling Tools Innovative Design
  <<First  <Prev  Next>  Last>>  Jump to