Font Size: a A A
Keyword [COWA]
Result: 1 - 13 | Page: 1 of 1
1. The Research Of Quality Management Influence Factors Of The Whole Process Of HY Business Center Real Estate Project
2. Research On Risk Evaluation Of Engineering Project Interface Based On G-COWA
3. Research On Construction Quality Evaluation Of Prefabricated Concrete Buildings
4. Research On Communication Management Of EPC General Contracting Project
5. Research On Risk Management Of Deep Foundation Pit Construction Based On Fuzzy Sets And Improved Evidence Theory
6. Research On Gray Clustering Evaluation Of Prefabricated Building Construction Risk Based On PCA-COWA
7. Cost Risk Assessment Of Prefabricated Concrete House Construction Stage Based On Matter Element Extension Model
8. Study On Project Scope Management Maturity Under EPC Model
9. Research On ZHC Underground Comprehensive Pipe Corridor Construction Risk Evaluation Based On Cloud Model
10. Research On Quality Evaluation Of Whole Process Engineering Consulting Service Based On Maturity Model
11. Research On The Quality Evaluation Of Cost Consultancy Service In The Whole Process
12. Fusion Decision Methods Based On Evidence Reasoning And Its Application In Fault Diagnosis
13. Dynamic Risk Assessment Of Subway Deep Foundation Pit Construction Based On Monitoring Data
  <<First  <Prev  Next>  Last>>  Jump to