Font Size: a A A
Keyword [Jacking construction]
Result: 41 - 60 | Page: 3 of 6
41. Technology Of Overhead Jacking Construction Of Frame Bridge With Large Span And Deep Foundation Pit For Existing Multi-tracks Railway
42. Measurement System Of Building Deformation Due To Pipe-jacking Based On Digital Image Correlation
43. Investigation On Deformation Characteristics Of Soil In Pipe Jacking Construction Under Railway Dynamic Loading
44. Roof Construction Of A Railway Box Culvert Under The Yinxing Road In Bozhou, Anhui Province And Settlement Analysis Of Existing Lines
45. Study On Key Technology Of Large Section Rectangular Pipe Jacking Construction In Shenzhen Metro Line 9
46. Study On Pipe Jacking Construction Control Of Existing Railway Corridor Under Existing Pipeline
47. Study On Safety Risk Analysis And Control Of Steel Box Girder Bridge Jacking Construction
48. A Study On Safety Risk Management Of Large Diameter Pipe Jacking Construction
49. Theoretical Study On Properties Of Soil And Structure During Pipe Jacking Construction
50. Influence Of Large Diameter Pipe Jacking Construction On The Surrounding Environment Under Complex Conditions
51. Study On Pipe Construction Technology Under Adjacent To Railway Environmental Conditions
52. Analysis On Jacking Technique And Frame Bridge Structure Of K45+997 Fujia-Railway
53. Study On The Construction Mechanics Of Subway Station With Flat Roof And Flat Roof
54. Applied Research Of Pipe Jacking Technology Under The Conditions Of Special Geology And Environment
55. Study On Mechanical Properties Of Large Span Steel Reticulated Shell During Whole Jacking Construction And Field Monitoring
56. Calculation And Analysis Of Jacking Resistance Of Rectangular Pipe Jacking Construction
57. Research On Construction Technology Of Pipe Jacking Method Based On Complex Environment Pipeline Relocation Project
58. Research On Key Technology Of Controlling The Top Force Of Large Diameter Long Distance Concrete Pipe Jacking In Loess Area
59. Research On The Ground Settlement Law Of Pipe Jacking Construction With Pebble Soil
60. Research And Application Of Long-distance Top Pipe Construction Technology In Municipal Water Supply And Drainage Construction
  <<First  <Prev  Next>  Last>>  Jump to