Font Size:
a
A
A
Keyword [Sand layer]
Result: 1 - 20 | Page: 1 of 5
1.
The Gate Dam Foundation Treatment Investigation Of Deep And Thick Overburden
2.
The Construction Technology Of The Pier In Water Of The Bridges No.1,2 And 3 Over River Mingyue Of The Railway From Dazhou To Wanzhou
3.
The Model Testing Study On The Frozen Wall Forming Affected By Seepage Water In Saturated Sand
4.
Analysis Of Heterotaxis Based On Stochastic Media Theory And Research On Control Technology For Shallow Excavation Method
5.
Study On The Face Stability Of The Sand Layer At Xiang'an End Of Eastern Passage Of Xiamen Subsea Tunnel
6.
Study On Surrounding Rock Stability Of Shallow Bored Tunnel In Water-bearing Sand Ground
7.
Seismic Isolation Of The Multi-storey Building Subjected To Blast Loading In Underground Tunnel
8.
Research On Bearing Characteristic And Quality Control Of Striking Pile In The Profundity Sediment Sand Layer Of Major Diameter PHC Pile
9.
Research On Bearing Characteristic And Quality Control Of Striking Pile In The Profundity Sediment Sand Layer Of Major Diameter Phc Pile
10.
Desert Regions Of Pavement Construction Study
11.
Enhanced Packed Sand Handling Interaction Layer Foundation Of The Application And Analysis Of Research
12.
Vibro Test And Application Of The Foundation Treatment Of Yangshan Port
13.
Research On Fondation Pit Dewatering Based On Watery Sand Layer And Complex Environments In Shenyang
14.
Research Of Tunnel Excavation Risk And Settlement In Water-enriched Soil Layers Of Qingdao Metro
15.
Study On Mechanism Of Silicified Double Solution Grouting Reinforcement In Silty Sand Layer And Engineering Application
16.
Study On The Compositive Construction Technology Of The Two-line Passenger Transportation Special Line Tunnel Which Passes Through The Water Bearingã€Satured And Powder Fine Sand Layer
17.
The Study On Sand Layer Liquefaction Characteristics Of Dam Foundation For Xiabandi Hydraulic Project.xinjing
18.
Study On Surrounding Rock Stability Of Tunnel In Saturated Sand Layer Based On Particle-flow Code
19.
The Construction Method Of Double Side Wall Heading And Numerical Simulation Analysis Of The Tunnel In Water-enriched And Weakly Cemented Sand Layer
20.
The Study Of Waterstop And Reinforcement Technology With Deep-hole Curtain Grouting At Thermal Mining Tunnel In Silty-fine Sand Layer
<<First
<Prev
Next>
Last>>
Jump to