Font Size: a A A
Keyword [Slurry shield]
Result: 61 - 71 | Page: 4 of 4
61. Study On Preparation Of Construction Quota Of Large Diameter Mud Water Shield
62. Study On Failure Modes And Influencing Factors Of Slurry Shield Excavation Face In Gravel Stratum
63. Study On The Characteristics Of Deep Soil Heave Caused By The Construction Of Large-diameter Slurry Shield
64. Study On Slurry Penetration And Stability Of Slurry Shield Tunnel Face Based On Interaction Of "Cutter-Soil"
65. Research On Ballast Motion Behavior In Shield Slurry System And Pipeline Service Life Prediction
66. Infiltration Characteristics And Spatial Filter Cake Formation Laws Of Slurries During Slurry Shield Tunneling In Saturated Sands
67. Study On The Formation Process And Effect Of Filter Cake During Slurry Shield Construction In Water-rich Sandy Stratum
68. Study On Resource Utilization Of Waste Mud And Residue Of Shield In Xinjizhou, Nanjing Yangtze River
69. Study On Preparation And Properties Of SST Sand Cement Based Materials
70. Research On Key Techniques Of Magnetic Medium Sealing For Slurry Shield Tunneling Machine
71. Experimental Study On Efficient Separation And Comprehensive Treatment Of Waste Mud From Slurry Balance Shield
  <<First  <Prev  Next>  Last>>  Jump to