Font Size: a A A
Keyword [Super shallow]
Result: 1 - 19 | Page: 1 of 1
1. Prophase Study Of The Ship Type Of 300,000t VLCC With Super Shallow Draught
2. Control Technique On Pipe Jacking In Unusual Shallow Underground Soils
3. The Research Of Large Cross-section And Ultra-shallow Subsurface Subway Station Construction Technology
4. Study On Construction Technology Of Large Section And Three-dimensional Cross-section Of Excavation Transfer Station
5. Study On Controlling Technique For Surrounding Rock Stability Of Three-dimensional Cross-section Of Excavation Transfer Station
6. Study On Surrouding Rock And Applying In Engineering Of Super Shallow Large-span Double-arch Tunnel
7. Design And Analysis Of The Cover Structure To The Supper-shallow-burial Undergroud Engineering
8. Study On Reinforcement Method And Safety Construction Technology Of Super Shallow And Unsymmetrical Pressure Section In Sanduanlin Tunnel
9. Study Of Vibration-Reducing Blasting Technology In Super Shallow Tunnel Unde-Travelling The Dense Houses Based On HHT
10. Research On Supers Hallow Geothermal Energy And Its Application Technology
11. Research On Mechanical Property Of The STS (Steel Tube Slab) Structure Used To Construct Shallow Buried Subway Station
12. Large Cross Section Tunnel At Shallow Depth Excavation Deformation Control Researcl In Both The Urban Road
13. Pre-reinforcement Method And Stability Analysis Of Subway Passing Through Ultra-shallow Buried Soft Formation
14. Technology Of Retaining And Protecting For Super-shallow And Large Rectangular Section Urban Underpass
15. Construction Optimization Of Super-shallow Buried Large-span Metro Station With Arch-cap Method In Upper Soft And Hard Stratum
16. Mechanism Research On Deformation Control Of A Shallow Subway Station By Using Pre-built Pipe Umbrellas And PBA Excavation Method
17. Study On The Safety And Environmental Protection Of The Construction Of Super Shallow Buried Arch Tunnel Under The Great Wall In Tourist Area
18. Research On Key Technology Of Jacking And Connecting Of Shallow Buried Steel Pipe In Pipe-roof Pre-construction Method
19. Research On Key Construction Technology Of Super-Shallow Buried Large Section Rectangular Multi-Hole Parallel Pipe Jacking
  <<First  <Prev  Next>  Last>>  Jump to