Font Size: a A A
Keyword [Tabu Search Algorithm]
Result: 141 - 145 | Page: 8 of 8
141. Research On The Scheduling Problem Of Pipe Fitting Processing Workshop In A Shipyard Based On Double Class Pallet Collaboration
142. Research Of Workshop Scheduling Based On Improved Artificial Bee Colony Algorithm
143. Research On Parameter Identification Method Of Synchronous Generator Model Based On Improved Fruit Fly Optimization Algorithm
144. Allocation Of Charging Stations For Electric Vehicles Considering Spatial Land Price And Limited Budget
145. Optimization Technology Of Dynamic Freight Train Operation Plan For Shenhua Railway
  <<First  <Prev  Next>  Last>>  Jump to