Font Size: a A A
Keyword [Transfer Waiting Time]
Result: 1 - 7 | Page: 1 of 1
1. Research On Coordinated Scheduling Of Integrated Public Transport System
2. Research On Intelligent Scheduling Algorithm For Urban Public Transport
3. Research On Train Rescheduling In Urban Rail Transit Networks
4. Study On The Optimization Of Passenger Transfer Efficiency In The Peak Period Of Urban Rail Transit Transfer Station
5. Study On The Coordinated Optimization Of Bus Timetable Considering The Choices Of Multi-line Transfer
6. Feeder Bus Timetabling And Vehicle Scheduling Optimization For High-speed Railway Station With Uneven Departure Interval
7. Research On The Transfer Waiting Time For Air-rail Integrated Service Hub
  <<First  <Prev  Next>  Last>>  Jump to