Font Size: a A A
Keyword [double shield TBM]
Result: 1 - 20 | Page: 1 of 2
1. Study On Surrounding Rock Stability Of Deep Tunnel By Double-Shield TBM Excavtion
2. Surrounding Rock Stability Control Theory And Technique Of Deep Buried Weak Rock Tunnel Constructed With Double Shield TBM
3. Study For Main Thrust System Of Double Shield Tunneling Boring Machine
4. The Analysis Of Geological Factors For Penetration Rate Of Double-shield TBM
5. Study On Construction Quota Of Double Shield TBM
6. Researches On Double Shield TBM Performance In Inclined Tunnel
7. Study On The Construction Technology Of Double Shield TBM In Inclined Tunnel
8. Study On Surrounding Rock Stability Of Tunnel By Double-shield TBM Excavion
9. Study On Formation Stability And The Stress Mechanism Of Supporting Structure In Subway Engineering By Double-shield TBM Construction
10. Research On The Key Techniques Of The Guidance System Of Double Shield Universal Compact TBM
11. Research On Key Techniques Of The Guidance System Optimized By Inclinometer Sensors Of Double Shield TBM
12. Research On Rational Driving Direction And Expansion Gap Of Double Shield TBM In Deep Mixed Rock Strata
13. Study Of Tunneling Parameters Of The Double Shield TBM In Urban Rail Transit
14. Study On The In-situ Stress Characteristics And The Stability Of Surrounding Rock By Double Shield TBM Excavation Of The Duoxiong Tunnel In Tibet
15. Study On The Interaction Mechanism Between Double Shield TBM Tunneling And Surrounding Rocks In Duoxiongla Mountain Of Tibet
16. Study Of Control Of Double Shield TBM Jamming By Numerical Simulation In Deep Squeezing Ground
17. Deformation And Control Technology Of Double Shield TBM Lining Structure In Metro Tunnel
18. Study On The Adaptability Of Double Shield Tbm Tunneling And Its Construction Safety Evalution Under Unfovorable Geological Conditions
19. Study On The Design Method Of Double-shielded TBM Drinage Segment Structure In High Water Pressure
20. Study On The Mechanics Analysis Of Rock Breaking And Excavation Parameters Optimization Of TBM In The Construction Of Small Section Water Diversion Tunnel
  <<First  <Prev  Next>  Last>>  Jump to