Font Size: a A A
Keyword [drainage board]
Result: 1 - 20 | Page: 1 of 2
1. Study On Intelligent Decision Support Technology For Expressway Ground Improvement
2. Studies On Practical Applications Of Dynamic Consolidation Method In Improvement Of Saturated Clay Foundation
3. The Application And Experiment Research Of Cement Deep Mixing Pile And Plastic Drainage Board Well To Improve Soft-soil Roadbed
4. Settlement Analysis On Reinforcing Soft Foundation With Plastic Drainage Board Preloading Method
5. Applacation And Research Of Plastic Drainage Board In The Soft Soil Foundtation Of Road
6. Study And Application Of Filtration Fabrics On Geotechnical Drainage Board
7. The Application Of Plastic Drainage Board In Soft Soil Ground Treatment In Shanghai Hongqiao Airport
8. The Study Of Vacuum Preloading Test And The Quality Of Protecting Soil Of Plastic Drainage Board Of Tianjin Harbor Industrial Zone
9. Study On Settlement-control Of Preloading Method Used To Treat Soft Clay Foundation
10. Research On The Consolidation And Settlement Law Of Soft Soil Foundation Reinforcement Plastic Drainage Board Method
11. Numerical Analysis And Field Experiment Research Of Soft Soil Foundation Treatment With The Method Of Drain With Pre-loading
12. The Study Of Saturated Dredger Soil In Guangzhou Nansha Port Based On Vacuum Pre-loading Consolidation And Numerical Simulation
13. Application Of Plastic Drainage Board Preloading With Dynamic Compaction Soft Foundation Treatment
14. Study On Theory And Application Of Vacuum Preloading With Long-short Plastic Drainage Board
15. Study On Effect Of Plastic Drain Board Method Reinforce Super Soft Foundation
16. Research On The Application Of Vacuum Preloading On Soft Foundation With Straight-Line And Long-Short Plastic Drainage Board
17. Three-dimensional Nonlinear Finite Element Numerical Simulation Of Embankment On Soft Ground Treated By Drainage Consolidation And Mixing Pile Method
18. Application Of Plastic Drainage Plate In Soft Soil Foundation Treatment
19. Experimental Study On The Consolidation Of Dredged Slurry By Vacuum Preloading With Prefabricated Horizontal Drain
20. Application Of Plastic Drainage Plate In Tailings Dam And Its Seepage Field Numerical Simulation
  <<First  <Prev  Next>  Last>>  Jump to