Font Size: a A A
Keyword [passenger dedicated railway]
Result: 1 - 20 | Page: 1 of 3
1. Decentralization-and-Self-Regulation-Based Multi-Agent Traffic Dispatching System For Passenger-Dedicated Railway Lines
2. Research On Stability And Dynamic Characteristic Of Tunnel-Tunnel Transition Section Filled By Improved Completely Weathered Granite For Passenger Dedicated Railway
3. Dynamic Analysis Of Subgrade And Bridge-Subgrade Transition Section Of High Speed Railway Under The Vehicle-Subgrade Coupling Condition
4. Strategies Models And Algorithms Of Train Operation Adjustment For The Passenger Dedicated Railway
5. Analysis And Optimization Of Pile-Board Structure To Loess Subgrade For Zheng' Zhou-Xi'an Passenger Dedicated Railway
6. Construction Technology Investigation Of Subgrade Engineering For Special Railway Passenger Transport Line
7. Research On Construction Technology Of Integrated Span Simple Support Girder For Qinhuangdao-Shenyang Passenger Dedicated Railway
8. Study On Application Of High Performance Concrete In The Passenger-dedicated Railway Line
9. An Application Of The Soil-Cenment Pile In The Roadbed Of Railway
10. Research On Ground Settlement Controls Of Shallow And Large Section Loess Tunnel Through High Speed Highway
11. Research Of Fuzzy Synthetic Evaluation For Embankment And Bridge Scheme In Newly-built Passenger Dedicated Railway Based On Genetic Algorithm
12. The Study On Transfer Plan And Forecasting Of Transfer Passenger Flow Between Passenger Dedicated Railway Line And Urban Transportation
13. Study On Terminal Station Operation Planning Of Passenger Dedicated Railway
14. The Down Hole Dynamic Compaction Pile Composite Foundation Application Research On Collapsible Loess Ground Of Zhengzhou To Xian Passenger Dedicated Railway Line
15. Study On Reasonable Work-Division Between The Passenger Dedicated Lines And The Existing Lines And Optimization Method
16. Study On Secondary Support Design Method Of Large Cross-Section Loess Tunnel In Zhengzhou-Xi'An Passenger Dedicated Railway Line
17. Post-Construction Settlement Controlling On Soil-like Embankment Of The East Cycle Intercity Passenger Dedicated Railway Line Of Hai-Nan
18. Study On The System Of Railway Station Operation Planning Of Passenger Dedicated Railway
19. Prefabrication And Erection Of 900T Pre-Stressed Double-Track Simply Supported Box Girder For Passenger Dedicated Railway
20. Study On The Safety Problems Of The Seamless Passenger Transport Based On Passenger Dedicated Railway Line
  <<First  <Prev  Next>  Last>>  Jump to