Font Size: a A A
Keyword [simultaneous grouting]
Result: 1 - 5 | Page: 1 of 1
1. The Optimization Test Research For The Ratio Of Concrete Back Fill Grouting The Segment In Shield Tunneling
2. Research On The Dissipation Mechanism Of Grout Pressure During The Simultaneous Grouting Of Shield Tunnel Based On Time-dependent Behavior Of Viscosity
3. Study On Mechanism Of Synchronous Grouting Anti-washout Property Of Shield In High Permeability Water-rich Formation
4. Research On The Tunneling Parameters And Soil Improvement Technique Of The Epb Shield Tunneling In Water-rich Sandy Cobble Layer Of Chengdu City
5. Research On Grouting Influence And Mechanism Of Shield Tunneling In The Sand-Gravel Stratum
  <<First  <Prev  Next>  Last>>  Jump to