Font Size: a A A
Keyword [Activity durations]
Result: 1 - 3 | Page: 1 of 1
1. An Optimization Model For The Resource-Constrained Project Scheduling Problem With Stochastic Activity Durations
2. Hydropower Construction Project Cost Determining Method Study Based On Activity-Based Costing Analysis
3. Managing new product development projects in a competitive market
  <<First  <Prev  Next>  Last>>  Jump to