Font Size: a A A

Shoring Parameter Designing And Optimizing Of Laneway Of Soft Rock By Advance Blot

Posted on:2007-12-25Degree:MasterType:Thesis
Country:ChinaCandidate:X X ChenFull Text:PDF
GTID:2121360185450241Subject:Geotechnical engineering
Abstract/Summary:PDF Full Text Request
Currently laneway of soft rock is a familiar and complicated problem in building of coal mine, success of its supporting or not decides the safety and normal of mine. Putting over of building of this kind laneway, besides realizing its basically geological circs, choosing scientific and logical section, means of digging and form of supporting. Choice of supporting parameter is extremely important too.Nowadays, blot shoring of advance stress applies sorts engineering in large numbers, but its applying in laneway of soft rock is not broad, large numbers of problems are being in the parameter choice of shoring designing.In the dissertation, characteristic of laneway of soft rock and its shoring form are firstly presented, virtue of blot shoring of advance stress and its applying in laneway of soft rock.. On the basic, probe into the optimizing and confirming of parameter of laneway of soft rock by blot shoring of advance stress importantly. Choising idiographic engineering for instance, simulated compute the deforms of different shoring parameter by large-scale compute-software ANSYS. Analyse and present diversified deformed figure in brief;select several keypoints, Scale deformed result by the level of radial displacement, look over keypoints' radial displacement of every simulating compute by the result of putting out;and draw out correlative curve of every keypoints under identical parameter of different numerical value, correlative curve of identical keypoint under certain shoring parameter of different numerical value;draw out the influence of every parameter and shoring effect, and confirm optimizing formula of parameter designing through quantitatively analyzing. The result of substantive simulating compute can be applied in designing of regional laneway. Be want to acquire entirety success of the shoring, construction is also one key process. How to deal with some problems appearing in the construction, come true the designing result correctly, feed back some idiographic appearing problems timely and take out relevant disposal measure synchronously.
Keywords/Search Tags:Soft Rock, Laneway of Soft Rock, Blot Shoring, Finite Element, Designed Parameter of Shoring, Analog Analyse, Radial Displacement
PDF Full Text Request
Related items