Font Size: a A A

The Research Of The Constructionquantity Control Of The Frame Construction Beam Pillar Deals With Contact

Posted on:2004-04-10Degree:MasterType:Thesis
Country:ChinaCandidate:H J LiuFull Text:PDF
GTID:2132360125963004Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Investigative purpose with meaning:along with our country economy fast development, town foundation facilities developments are on the up.Among them, the frame construction will still be the construction quantity that a kind of application have great capacity the wide construction in form in front and from now on very longly of a period of time, but investigate the detection, the frame construction beam pillar deal with contact make person worrying, they or is to have the beehive, reinforcing bar to peep out to wait the external appearance blemish outside, or is to exsits the concrete strength grade prohibit, reinforcing bar protection internal quantity in etc. in shortage in thickness in layer problem.Oneself the hope passes own research, adopting a kind of all new construction method with start construction principle, guarantee the frame construction beam pillar deals with contact the construction quantity.Investigative method:this text made use of 20 centuries 40's creation in lesson an investigative process and continuously deep turn with system science theories that developped with system science method, according to the basic knowledge that quantity manage completely, the actual circumstance of the close combinative construction the spot, at the same time, still pass the internet access the search and borrow to read, purchase and visit to investigate etc. every kind of means, backlog, apply, consults domestic and international and numerous cultural heritages data. Finally, proceeded the experiment application in north China the construction process of the electric power university library engineering.Investigative result:through the research, comparison, a kind of construction, system exterior environment three combinations of the quantity, system that deal with contact each main factor of system oneself to frames construction beam pillars proceeds the project( in control process a system for choosing main factor can be a combines an or some, also can be all main factors) of the control become many possibilities with the best project of the possibility project inside.
Keywords/Search Tags:The beam pillar deals with contact, Construction quantity, System theories
PDF Full Text Request
Related items