Abstract/Summary:PDF Full Text Request
With the rapid development of power market and implementation of"separation of grid and generation, bidding for the price to operate",the power enterprise participated in the competition gradually. The economical operation of hydropower plant will not only increase the economic benefits, but also make sense for solving the increasingly conflit in the energy supply and demand.Considering the fact of Fengman, statistical calculation of the hydropower plant's load was carried out by the application of a comprehensive coefficient and the general law of the service power was concluded by the regression analysis; with the idle loss water simple algorithm, the idle loss water of the Fengman hydropower plant was calculated and the algorithm was also be improved. the consumption flow function of hydropower generator based on the radial neural network and the main transformer efficiency function along with the service power of single generator was set up. with the application of direct search tools and genetic algorithm, the optimizing scheduling were carried out in Fengman hydropower plant, comparing with AGC (automatic generation control) direct share, the optimizing contrast results was presented, and a profected economic operation system was proprosed in theroy for the Fengfan hydropower plant.
Keywords/Search Tags:hydropower plant, economical operation, wastes the water volume, radial basis function(RBF) neural network
PDF Full Text Request
Related items