Research On Time Optimization Of Construction Projects

Posted on:2005-11-22Degree:MasterType:Thesis
Country:ChinaCandidate:S M WangFull Text:PDF
GTID:2156360122488432Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Three major objectives of construction project management are time, quality and cost. This thesis analyzes problems in controlling the three major objectives in most construction project management of our country, which are of one-sidedness, blindness and random. The research purpose is optimizing the three objectives based on integrating them in order to improve the overall effect of project management.The thesis describes the characteristics, the relevant theories and methods of time, cost , and quality control during construction stage of a project, analyzes the factors influencing time, cost ,and quality of a project in the process of implementing a project by using the system theory, then introduces the method of preparing the construction planning document and the organizational mode on job-site, and then builds the WBS model, which taken as the base of developing the quality, time and cost plans and the base of determining construction sequences controlling the process; besides explains the overall network schedule, the baseline of schedule control, including its content, procedure, and overall optimization.The thesis illustrates the method, procedure, and optimization problems of developing a integrating schedule curve based on work-hour and cost, which are bases of managing construction. Discussions are introduced about the principle and process of measuring and evaluating the implementation effect of project control, performance evaluating curve, method of comparing actual work to scheduled work, and corrective action on schedule variances.After analyzing the relationship between the three major objectives, focusing on the integrating optimization question, the thesis suggests an optimizing model under the constraints of time, quality and cost. At the last, the thesis studies the consuming rule, the theoretical foundation, the demands of labor, equipment, and materials and the structure optimization of construction resource utilization.
Keywords/Search Tags:construction project management, schedule control, overall integrating schedule, schedule model under constraints of quality and cost, overall optimization of the construction resources
PDF Full Text Request
Related items