Font Size: a A A

The Research On Pipeline Project Risk Management For Consultant

Posted on:2005-09-20Degree:MasterType:Thesis
Country:ChinaCandidate:F LiuFull Text:PDF
GTID:2156360122987620Subject:MBA
Abstract/Summary:PDF Full Text Request
Besides the general project characteristics, the Long-distance pipeline project period, higher qulity requirements, high frequency mobilization and badder working conditions, which will induce more risks in pipeline construction and more loss of the risk. At present, Consultant usually sign contract with the Owner and are responsible to provide projet management service in pipeline construction. In order to make the project execulted smoothly, Consultant have to manage project risk successfully. Firstly, the cuerrent research situation and development trend both in domestic and international pipeline project risk manangement are analyzed in this paper. Then a further study on project risk identification, project risk analysis, and project risk response and project risk control strategy is made. Based on the analysis result and consultant's work process in pipeline construction, this Paper make a deep study in risk management for Consultant in pipeline project bidding phase and pipeline project construction phase. In the first phase, according to the informations getted in different periods, incorporate the bidding procedure of Consultant Companies,this paper present an AHP evaluation system for risk management ; In the second phase, based on the combination of WBS( the Work Breakdown Structure work resolve construction) and RBS( the Risk Breakdown Structure risk), through controlling the small unit of the easy to management with the targets for progress,cost,quantity and HSE,the Consultant will manage the project construction risks successfully and realize the project objectives.Finally, combined together with cases ananlyses, this paper present the major methods and critical techlogy used in pipeline project risk management for Consultant. Inspired from the cases, the auther thinks this risk management process is of a good applicable value for risk management for those Consultant Companies, and as well as of a reference for risk mangement for other orgernizations.
Keywords/Search Tags:Pipeline Project Risk, Bidding Phase, Construction Phase, Risk Management for Consultant
PDF Full Text Request
Related items