Font Size: a A A

The Research Of The Risk Management In "Zhougongshan Nanshuige" Hotel Project

Posted on:2005-02-04Degree:MasterType:Thesis
Country:ChinaCandidate:Z N LiuFull Text:PDF
GTID:2156360152966069Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Risk management is base on the forecast, distinguish; evaluation and scientific analysis on the risk. It offers the possibilities of the way to deal with the risks of the project. It's one of the scientific and direct methods to manage the risk. As a project engineer, he must know that it's important to manage the risk of the project, only by this way we can avoid and control the risks of the project, and to improve the project to a more successful position.In this paper we use the expert-investigation method to distinguish the risks of the project and then we build a model and to use the analysis of hieratical process(AHP)to evaluate the risks of the project. After this we get the weighs of every risk we distinguish and we also get the high, middle and low probability of the project's whole risk. And then we analyze the two important risks of the project, the market risk and the design risk, we also make out the methods to control the risks. Finally we identify the value and the weakness of this research.Qualitative and quantitative analysis are used for the analysis on the risk. We also sum up the basic methods to control the risks of the project. This paper Is meaningful in establish the awareness of the risks of investment and to manage the risk of the project properly.
Keywords/Search Tags:Hotel project, Risk management, AHP(analysis of hieratical Process)
PDF Full Text Request
Related items