| In the 1990′s.Michael Hammer,aprofessor of MIT in USA andJames Champy,the president of CSC management and consultant firstput forward the concept of Business ProcessReengineering(BPR).Since this theory is well accorded with thedevelopment trend of contemporary enterprises,it has not onlyapproved and accepted by many domestic and internationalenterprises,but also applied successfully in a wide area forbusiness innovation.Since 2000, General Post Office put in practice ElectronicExchange System,Uniform version Post Bank System ,Insurance AgentSystem , Open Fund System and Two Network(Electronic ExchangeSystem and Post Bank System) Interpenetration System step by stepand so on. Untill now we have finished national version differentbusiness system ,System structure which it is provincel_level ornational_level processing center of integrate model almost havebringed about,It has beening extremely promoted development aboutpostal finance business and improved service quality outside.But because these systems have different background ,periods,development corporation,which leads to the independence ofthem.Now the tellers who worked in postal branch must login in thedifferent systems when they process different business.Their worksare very troublesome.The condition leads to that the resources cannot be effective utilized,and the service can not be uniformoutside,It is restricted that the service quality and level,So weshould carry out the Business Process Reengineering.The following the postal finance systems building in thecountry, National postal informationize level is proving,Thepostal finace systems have finished the uniform version step bystep.For the postal resoures can be comprehensive utilize,Adapingto the objectiver requires from the market and the enterpriseinside,offering the uniform service outside releasing the pressurefor the teller,bringing down the inter production cost,improvingthe efficiency.In order to the uniform counter services ,the frontsystems of the postal finace systems will be reengineered.According to the circumstances earlier in my demonstration,Ianalyse particularity the flow of the front system and put forwadthe probems.To the questions linked the ruler ways ,steps of BPR,Iput forwarded two methods of BPR ,thereinto,the first project thatthe host-branch ing institution-teller is full conformity focusmanagement.The project includes the prefix system is uniformversion,It ' s actualizing plan is province_level andnational_level ,the interface of the pront serve,According as theface ,the different method maybe taken.The second project is thatthe main menu will be added in the front munu,and the correspondingconnection method about branch and teller.The originally menu willbe reserved,the main menu will be added . Via the main menu ,thedifferent the system menu will be loaded or unloaded.The teller amylogin the different menu and transact correspond business via themain menu,and they do not switch the screen .If the teller want todeal with a new business,who must return the main menu and then loginanother menu via the menu.Second ,we contract the first project to the secondproject,linking our enterprise conditions.The frame of the firstproject is reasonable,according with development about backgroundsystem conformity and channel conformity of bank system.Itsforesightness is very good.It can be appease sufficiency therequires of operation.But the project of the BPR is releasing thepressure for the teller,promoting their service.We don't hopt tomodify the old system in its entirety.Because the background systemhave be not integrated,the old system will be changed biggish.Theimmplementary difficult is prodigious.Syntheticallycalculating ,the second project's workload is less ,its period isshort,its effect is evidence.Its content amended is petite.Theconcerted work is less.So we select the second project acting asthe feasibility method of handle of handle is discussed in thepaper.The third the sustentation of the information and technologyis key for the project .For the succeed of BPR the change ofstructure is important before the project is started.At last,I have made a plan about the BPR based on the rulesof BPR .The resistance and risk is analysed about the process,sothat the system can convent reposedfully , meantime the evaluativesystem is founded about the impersonality effect.The evaluativetarget are founded,it can check up the feasibility and validity ofthe project. |