Font Size: a A A

Mountain Torrent Disaster Prevention And Control Of Implementation Scheme Of Gangcheng City Non Engineering Measure Construction

Posted on:2016-12-22Degree:MasterType:Thesis
Country:ChinaCandidate:J CaiFull Text:PDF
GTID:2180330473466163Subject:Control Engineering
Abstract/Summary:PDF Full Text Request
Mountain flood prevention is a complex systems engineering, must hold to avoid treatment combined with, avoid focused on governance, control principle, in order to prevent the main consideration, to ensure the safety of personnel as the priority targetIn the Gangcheng City calabash mountain 6 mountain flood prevention in this scheme:the transformation of the existing basin rainfall stations 2,50 new simple rainfall station, automatic rainfall monitoring station 7, station 3 automatic water level, rainfall and water level of integrated video monitoring station 5, heavy rain monitoring station 2, mobile meteorological station 1 set, consisting of rain, hydrological monitoring station network. In the dangerous area of 465.2 square kilometers of mountain flood disasters in terms of automatic rainfall station arrangement average density reached 25.8 square kilometers/station, automatic water level stations is the average density of 38.8 square kilometers/station, including the establishment of video monitoring system of 5 video monitoring site, a set of schema network, data monitoring and early warning platform library, cloud computing, geography information technology; construction by the 6 wireless alarm system transmitting stations,45 radio warning receiving station of components from the early warning platform to emphasis prevention region; the establishment of group measurement and early warning mechanism and organization system of proof. Through the construction of steel city in monitoring and early warning system, the establishment of mass monitoring system, improve the defense plans, flash floods disaster prevention knowledge propaganda, raise a series of non engineering measures of national disaster prevention awareness, sharing the realization of water conservancy, hydrological, meteorological departments of land and resources, monitoring information in real time, meet the flood monitoring, forecasting, early warning needed to macro grasp the rain, temporal and spatial variation tendency in the territory, and in accordance with the preliminary analysis of the set water level and rainfall warning level, realize the real-time warning. To achieve the effective prevention of mountain flood, change of mountain flood disaster becomes more and more serious situation, reduce casualties and property losses, ensure safety target area.
Keywords/Search Tags:Mountain torrent disaster, non engineering measures, implementation scheme
PDF Full Text Request
Related items