In recent years the tunnelling speed gradually improve,based at home and abroad of inclined shaft constructionexperience, tunneling technology and driving method has been constantly updated.But in contrast, the tunneling technology still has notobtained the very good development. Is mainly due to the mine was most still mechanization level is not high, and the process organization is not reasonable, the driving speedlimits. Based on the background of Inner Mongolia Long Wang Gou mine main shaft excavation of inclined shaftconstruction, rapid construction of fully mechanized excavation technology research.This text describes the current situation at home and abroad in the construction technology irst, a brief description of the inclined shaft construction technology and machinerymatching scheme, after the influencing factors on the high-speed driving from several construction process, the tunneling equipment, the geological condition and the construction organization management aspects are analyzed, the technical measures and management measures for reference based on rapid excavation is proposed.Based on the above theory, the Dragon King Gou mine main shaft bedrock rapid construction of fully mechanized excavation process are analyzed, and measures for improvement are put forward. Has the certain reference value to the development of mechanization of construction technology of inclined shaft. |