Font Size: a A A

The Factors Analysis And Countermeasures Discussion Of Extending The Butadiene Plant’s Running Cycle

Posted on:2015-04-06Degree:MasterType:Thesis
Country:ChinaCandidate:Q LiFull Text:PDF
GTID:2181330467459646Subject:Chemical Engineering
Abstract/Summary:PDF Full Text Request
Conditions for the Lanzhou Petrochemical Company butadiene plant operating cycle is shorter.In this paper, through the operation of the butadiene plant in recent years were summarized,conducted a comprehensive analysis of in terms of abnormal operating conditions adjustment method, polymerization inhibitor mechanism, changes in the composition of raw materials currently on the system impact,self-polymerization mechanism of1,3-butadiene, B-T101tower internal structure and B-T103tower pressure rises he equipment operation, etc. Mainly due to the extraction system pressure increases, resulting in the system not high load operation.On the basis of a comprehensive analysis,Finded a set of emergency measures to adapt and daily management of the device, thereby improving plant operation cycle.
Keywords/Search Tags:Operating cycle, Pressure rises, Aggregation reason, Precautions
PDF Full Text Request
Related items