There are many uncertain factors in the process of construction of coal mines,including long construction period, high investment, complex internal management,participate in many units and work great. Therefore, the mine construction organizationoptimization work in mine construction plays an important guiding role, it has the dualrole of strategic and tactical arrangements. And embodies the basic construction planand design request, provides the various stages of construction preparation workâscontent. Coordinate in the construction process of the construction unit, the constructionwork, the relationship and the various resources.In this paper, Ya dian mine, for example, combined with the actual situation of themine construction, and mine safety management in implementing the basis ofdocuments, with scientific methods and means, from the analysis of the maincontradiction to start mine construction. Focusing on the building program, constructionperiod, construction plan, the wellbore through, pressure air system, wellbore changecutter, shaft equipment and other works for a reasonable analysis. Closely with actualand outstanding economic efficiency under the premise of mine for a number of keypoints to optimize the construction program, and proposed the construction of theoverall optimization of mine.Through this research project, the construction period will effectively enhance thesynergy between the various construction units, integrity, in order to improve workefficiency and construction management level, improve investment returns have greaterpractical significance. |