Research On Models Of Total Project Cycle Budget Management In Aerospace Four Homes

Posted on:2012-05-18Degree:MasterType:Thesis
Country:ChinaCandidate:G H WeiFull Text:PDF
GTID:2189330332493489Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In the "Eleventh Five-Year" period, Aerospace Science and Technology Corporation preliminarily formed a comprehensive budget management system, basically realized the closed-loop management with prior forecast, ungoing control, afterwards assessment and continuous improvement, continuously deepened budgeting concept and continuously improved budget of the basic work. Budget management has become the important means of controling implament of operation and development target in units and has played an important role in strengthening risk management, promoting cost savings, coordinating resources and implementating incentives. Implementing the project life-cycle model can help improve model project management mechanism, integrate resources and achieve the overall project planning model. Over the next few years, deepening the budget management of the focus project and implementing the Model Project Budget management will become important step forward to deepen comprehensive budget management system.Based on the management of project budgets at home and abroad, and on the guidance of a comprehensive budget management and project budget theory and methods, this paper took space four homes and major civil military project model project as the research object, combined qualitative and quantitative methods analyzed aerospace four homes four hospital status of project management models, and discussed management model and methods of the implementation of the space four homes model project full-cycle budget.Regulating the organizational system and personnel responsibilities of whole cycle budget of model project provides organizational guarantee for the smooth conduct of full cycle models project budget; four homes Building models of space budget for the entire project cycle management processes standardized closed-loop system of the entire project cycle from budget preparation, implementation, adjustment to assessment, and provided management basis implementation of model projects full-cycle budget for four homes, helped address the disconnection between management and technology budget, and reasonablely dealed with "mismatch" phenomenon between budget management and accounting; A unified model project budget form system reasonablely solved phenomenon that various economic entities subsite to the space of four homes have different budget content because of their differences in types. By analyzing the essential points and difficulties of preparating and implementation in model project budget, this paper established a feasible method of model project budget, improved the scientific and accuracy of preparating model project, strengthened the project prior forecast, ongoing control and afterwards assessment, improved the enforcement of the project budget model, and served for making scientific decision of sustainable development of the aerospace four homes.
Keywords/Search Tags:Model Project, Full-cycle budget, Model of management
PDF Full Text Request
Related items