Font Size: a A A

The Investigation On Investment Risk Of Xiaoxi Hydropower Station Project Of Hunan Xiangtou Holdings Group

Posted on:2010-11-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y Y HuangFull Text:PDF
GTID:2189330338982326Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Our country hydro energy fruitful in resources, the water and electricity energy takes the clean energy, the development potential is big, the water and electricity power rate accounts for the total electric quantity 1/4, simultaneously, follows the water and electricity investment multiplication, the water and electricity project cost of investment is enhancing, the investment risk enlarges gradually.This article unifies Hunan to throw Hunan Sinshao thin bamboo mountain stream power plant construction the reality, the discussion enterprise carries on the hydroelectric power station invests when how recognizes and the guard investment risk. this article has carried on the analysis to the water and electricity project investment's macroscopic environment, using risk analysis methods and so on fault tree has carried on the quantitative analysis to each kind of risk factor, causes the risk control to have the feasibility; The risk economic evaluation is the investment decision important link, but the national economy appraisal and the financial appraisal are carry on the hydroelectric power station investment decision two important norm for reference, water and electricity enterprise when financial appraisal mostly only takes each financial norm the computed result, should consider fully the element of certainty to financial norm's influence, causes the finance evaluating indicator to be more effective reliably. This article through after the thin bamboo mountain stream power plant investment decision, the construction process and completed the real return carries on the analysis, front the application investment risk analysis method carries on the risk analysis actual, the union project construction proposed the thin bamboo mountain stream power plant investment risk management games.This article in view of the hydroelectric power station investment decision and the management process complex characteristic, the project investment existence great investment risk, the fault tree risk analysis method is the adding water power plant risk factor carries on debates the knowledge, the analysis, to seek for the countermeasure the effective measure, may the probability which and the loss size occurs to each kind of risk factor carry on the quantitative assessment, takes advantage of this hoped that changes Hunan Hunan to throw the group present risk control mainly to depend upon investor individual decision-making the limitation, will cause the group to invest in the hydroelectric power station project in later, can reduce the investment risk effectively scientifically.
Keywords/Search Tags:Xiaoxi hydropower station, Project Investment, Risk management, Risk control
PDF Full Text Request
Related items