Font Size: a A A

The Research And Application Of EPC Mode In The Engineering Project Management

Posted on:2008-10-17Degree:MasterType:Thesis
Country:ChinaCandidate:M M LiFull Text:PDF
GTID:2189360245497237Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
EPC (Engineering-Procurement-Construction) for overall project-contracting is a new type of construction contracting and management mode formed during these years. In the 90's last century, our country starts getting in touch with EPC engineering project management. It is recommended for projects, where a higher degree of certainty of final price, and the contractor takes total or partly responsibility for the engineering, procurement and construction of the project.Due to the definition, development background of EPC and difference between the domestic current EPC management level and abroad, the paper puts forward that necessity in studying EPC mode. For the Contractor, the point how to manage in the project, which includes Engineering Management, Procurement Management and Construction Management, is put up in the paper.According to these principle analyses and the characteristic that the Engineering purcharge in EPC project is important, the idea of the Concurrt Engineering will be put forward in the paper into three purcharges in EPC project, at the same time, the new organization model of EPC project will be also put up according to the Concurrt Engineering. Meantime, the homologous improvement and suggestion is put forward because of the drawback of the EPC mode.At the end of the paper, it talks about how to put the idea of the Concurrt Engineering into the practical applications of the EPC project. And the management point of EPC mode will be analyzed in detail. At the same time, a case of EPC Mode is designedThe principle of combining theory with practice is applied in the paper, and original case is improved together with the idea of the Concurrt Engineering. There is profound theoretical and practical significance.
Keywords/Search Tags:EPC mode, project management, concurrt engineering
PDF Full Text Request
Related items