Font Size: a A A

Project Management Optimization Of Liaoning Province Post And Telecommunication Engineering Bureau

Posted on:2011-04-10Degree:MasterType:Thesis
Country:ChinaCandidate:A L ChuFull Text:PDF
GTID:2189360305457422Subject:Project management
Abstract/Summary:PDF Full Text Request
Communication construction market competition, as a new business, and the introduction of new technologies, the construction of the operators, the cost, schedule, and quality control of resources, puts forward a higher request, also forced the communication construction enterprise continuously optimization of the project management level. Project management for successful implementation of projects, the role of more and more people have to admit, gradually become the consensus of people. Liaoning telecommunications corporation as a communication construction enterprise, a subsidiary of China mobile group company. With rich experience in the construction of communication, project management system improvement. But with the enterprise internal and external environment changes, facing new challenges, the enterprise internal still exists some problems that can not be neglected in.A business structure is unreasonable, the quality of economic growth is not high. Second is the enterprise management and reduce the cost of increasing profit level. Three is staff structure and enterprise development requirements, the core competitiveness. Four is advanced management means and methods used widely, management innovation and technological innovation effect is not obvious. 5 is the process quality is improved, but the existing situation. Jagged 6 is the level of enterprise management and informationization level is not high, the slower pace of innovation. Seven is responsible for the safety and measures, in the administration of production safety in some links are weak, some employees safety consciousness, safety hidden still exist.According to project management process of the above-mentioned problems, liaoning telecommunications corporation communication engineering project management will adhere to the optimization of project management, project management principle of overall coordination principle, project management, project management principle of human capital of culture wins principle, the standardization of construction project management, project management principle of economic benefit evaluation principles. On the basis of liaoning province, post and telecommunications corporation to give full play to the technological advantage communication engineering construction and construction experience, through comprehensive, the whole staff and the project management, fine, standardized, professional, routing management function, strengthen the project implementation process each link, each department of the organization and coordination of engineering quality, the project schedule, cost and safety of construction projects, with four goals to realize the optimization, the overall goals for the construction unit to rationalize, offer a good quality, reasonable price and fast construction excellent projects.In liaoning postal communication engineering construction corporation the existing problems in the management of project management, based on the principle of optimization, and on the basis of optimizing targets set, and puts forward the optimal scheme of project management, including project management process and performance management, quality management, production management, security management and communication material management and employee training rationalization proposals from seven aspects of content management, etc. Process management, project management, including project tendering project management, distribution of communication lines construction management, communication pipeline construction management, equipment installation construction management, construction management, installation tower engineering data management. Performance management including engineering construction engineering company performance assessment, performance evaluation. Quality management, quality management, including the department goal responsibility, post quality management responsibility target, quality management standard. Safety production management including organization and the duties of the work of production safety, safe production system, inspection and assessment. In a highly competitive market, the mobile communication network is the measure of quality of service quality of telecom operators and improve users' perception of key elements, engineering construction quality directly determines the stability of the equipment and network, communication operators on the quality of engineering construction enterprise construction technology and engineering quality put forward higher request. Liaoning mobile companies with 3G network of liaoning province, the large-scale construction corporation contracting of post and telecommunications network construction project starting gradually to increase. But the original specification on engineering construction technology content, become high-quality network construction of block TD.From years of experience, with engineering technology has been greatly improved, the rate of obstacles in equipment, and can effectively decreased year promotion network quality. But some construction personnel and no attention to the project process standards, many are no grounding, without considering the enterprise shenzhen weiqiang, preventing electromagnetic coupling, safety factors such as electricity and network for communications network, this index, resulting in a hidden buried equipment. Stability, Therefore, strengthening the construction craft standard optimization is to guarantee the quality of engineering requirements. Liaoning telecommunications corporation communication project construction process optimization scheme, including indoor installation technology standards, outdoor equipment installation technology standards and construction standards from three aspects. Among them, the technical standard of indoor installation includes host installation, cable, cloth. Outdoor equipment installation process standards including antenna, lightningproof grounding system and construction standards.Finally, the paper liaoning post project management corporation communication optimization scheme and construction process optimization scheme, sound management mechanism, improve the level of business activities, insist on quality and leading service strategy, strengthen financial budget and control plan, optimize structure, promote enterprise culture construction and creating safe development guarantee system in seven aspects countermeasures.
Keywords/Search Tags:project management, quality management, process management, security management
PDF Full Text Request
Related items