Font Size: a A A

Research On Risk Management Of Engineering Claims Based On Influence Diagrams

Posted on:2011-06-21Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiFull Text:PDF
GTID:2189360308454807Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
Risks of engineering project prefer to the various possible risks in the entire project life cycle. Risks exist in any projects. Because of the large investment, long construction period, and numerous uncertain factors, various risks exist during the planning, designing,building and using after completion of the engineering project.The risk management of engineering claims is a verge subject mingling social science and physical science and involves much professional knowledge like engineering technology, contract law, trading accounting and public relationship etc. The building enterprise of our country in aspect of engineering claim management, in spite of in theory or practice still have greater gap with foreign same enterprise. Claim risk is the important composing of engineering risk management. It is to bring with implementing and engineering claim of engineering project. Claim management concerns contractor and the personal benefit of owner. It should attach huge importance to both. In aspect of theory,the developed countries have formed certain theoretical system and perfect method for the research of claim and risk. In aspect of practice, they have also accumulated rich experience. It is important promoting role to enhance the engineering project of management level of our country.A comprehensive analysis of risk factors on engineering claims, a comprehensive evaluation of risk factors on engineering claims, finding the main factors to manage, is the key of ensuring the smooth implementation of projects. This article build an evaluation system of engineering claims risk based on influence diagrams through analysis and assessment of engineering claims risk. The purpose find the main factors caused engineering claims and play a role in the risk management of engineering claims.The study is for the employers' reference. Meanwhile it is valuable for consulting agents etc.
Keywords/Search Tags:Engineering Claims, Risk Management, Influence Diagrams
PDF Full Text Request
Related items