Font Size: a A A

Risk Assessment Study Of Bozhong 3-2 Wellhead Platform

Posted on:2011-12-16Degree:MasterType:Thesis
Country:ChinaCandidate:R L BaiFull Text:PDF
GTID:2189360308454817Subject:Project management
Abstract/Summary:PDF Full Text Request
In order to effectively reduce the risk of marine offshore oil development, Minimize the probability of occurrence or reduce the risk, Demands that we in the marine platform the building stage to identify an effective probability of occurrence of various risks, And in accordance with the corresponding probability of occurrence the risk to develop countermeasures, To effectively control the occurrence of the risk. In this paper, use Event Tree Analysis, For the building phase of the wellhead platform Bozhong 3-2,Obtained by analyzing the probability of occurrence of various accident, And then identified the site operator's "annual personal risk", Assess the overall level of risk at this stage, And to quantify the risk assessment process for the more significant risk of having the appropriate safety recommendations, provides a useful guide, Safety in production operations as a platform to provide a strong guarantee.
Keywords/Search Tags:Risk Analysis, Event Tree Analysis, ALAPR, offshore platform
PDF Full Text Request
Related items