Font Size: a A A

Xac Civil Aircraft Development Process Based On Modern Project Management

Posted on:2005-05-24Degree:MasterType:Thesis
Country:ChinaCandidate:J WangFull Text:PDF
GTID:2206360122481396Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Developing civil airplane market has become an important stratagem for many airplane manufacturing companies. And Developing civil airplane has been a good method to improve our level of airplane development and pursue after the world advanced technology. But our civil airplane development has many problems especially at the side of management. It is a complicated problem how to use advanced management idea to direct our jobs of civil airplane development.This paper investigates the condition and actual problems of civil airplane development, and then brings forward the plan that the correct management concept must be set up first, and we improve on the management process with this idea: In view of the complication and the condition of civil airplane development,general organizing structure in project management, we redesign theorganizing structure-the strong matrix based the tetrahedral coordinates. Analyze the management job of the civil airplane development, thenresearch management process with the idea of project management, set upthe new whole work flow. Research some work flow such as risk management as a hotspot in projectmanagement. Then analyze manufacturing technology, we put forward aconcurrent engineering concept and the establishment of IPT (IntegratedProduct Team).
Keywords/Search Tags:civil airplane, project management, process, risk management, concurrent engineering
PDF Full Text Request
Related items