Font Size: a A A

Research, Project Management Information System Based On The Wbs

Posted on:2005-07-25Degree:MasterType:Thesis
Country:ChinaCandidate:Z D WuFull Text:PDF
GTID:2206360122981629Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Modem project management technology and tools provide scientific method & means for construction project management. The application scope of PMIS is constantly extending along with the wide application of computer and information technology in construction and engineering practice. The traditional trade appearance of low management technical content in construction project field is changed step by step.This paper takes PMIS as the main object of studying, it applies the theory and means of Project Management Knowledge System, and the specific features of construction project management on the research. It makes detail analysis and deep study to the application of WBS for project management, CICS, coding system, the process control of project management and the application of PMIS in construction project management. On the basis of the above studying, the paper advances the application pattern of WBS- base PMIS for construction project management and the referenced plan for the functional structure and management process design of PMIS. based on WBS. At the same time, the paper combines with informatioin technology and the features of Information System's develop, analysis, design and practice to study the PMIS 's developing strategy, the technical frame of IS and the management pattern of database. Furthermore, the paper provides the complex developing strategy of PMIS, the three-layer technical frame based on web and the technology of RDMS. The relative referenced diagrams and content are given in this paper.
Keywords/Search Tags:Work Breakdown Structure (WBS), Project Management Information System (PMIS), Construction Project Management, Construction Project Information Classification System (CICS), Information Code
PDF Full Text Request
Related items