| Zhongshan City is an easy subject to a flood disaster hit the city, complex system must work with the corresponding non-engineering measures combined, can play a greater role. In particular the flood prevention period, a wide range of flood forecasting and monitoring of large water conservancy projects, scheduling, the need for a more systematic and comprehensive software platform to help support the completion of three anti-command to resolve all the work of coordination, coherence, closer issues. This is the flood prevention and drought control precautions (three defenses) command system platform of the importance of the building.This thesis first introduced the Zhongshan City, and three defenses command system platform construction of research background, analysis of the construction project information status of the project, developed a platform-building objectives and boundaries. Followed by a demand for research, design framework, refined features, platform and lessons learned, and so on. In the implementation process, I achieved certain results of the work, the main problems:1,Grasping heavy demand analysis. In-depth analysis of the system construction of the platform performance requirements, functional requirements and demand for a comprehensive database, listing the main business processes to determine platform-building objectives, the domestic development of similar units in other peer system to the needs of the investigation, will play The basis of the guiding role.2,Grasp the focus of the building. According to the three anti-work "fast, accurate and reliable", to grasp platform operating efficiency, and ensure rapid response system and then continue to streamline the data, useful data that can not be less, not to a useless, the establishment of a Third Integrity of the data entry audit system to ensure the validity of data entities, authoritative and up-sexual. I work in the construction of the platform, firmly grasp the three key to commence work.3, System-building step-by-step implementation of the project implementation, information technology project in phases gradually promote:â‘ Information technology task force set up as a project-specific offices, and made responsible for the preparation of the system construction tasks, clearly the goal of building systems;â‘¡System Planning hardware from the start, the first building networks, the purchase of computers, office to promote e-government and the use of the Internet;â‘¢In the hardware construction have a certain scale, significantly raising the level of operators and application of information technology gradually in-depth, focus on building software has been developed Overall management of three defenses of information decision support system, the establishment of data updates and security system.Finally this thesis, the more "all-inclusive package of" implementation modalities, made the following findings: step-by-step approach to project implementation at each sub-item by the appropriate professional companies, to take full advantage of professional firms in the areas of technical expertise, Help owners control the progress of construction projects and projects that improve the demand. Third-command system in the promotion of practical application and implementation process, to strengthen management and standardize data point of view, the implementation of similar systems, with a high degree of operational information and reference. |