Font Size: a A A

Based On P3e / C Project Management, Contract Management As The Core System Exploration

Posted on:2006-03-01Degree:MasterType:Thesis
Country:ChinaCandidate:A Z LiFull Text:PDF
GTID:2209360185471435Subject:Water Resources and Hydropower Engineering
Abstract/Summary:PDF Full Text Request
Open along with the reform continuously thorough, our country economy the construction develops continuously, the engineering item construction also come to a the unprecedented high tide, item management in economy constuct of function also more and more obvious, engineering construction the realm owner is responsible for make, the engineering recruits to bid to make, the engineering reason make, contract management make, risk management make the basic system of etc. to get the further development and perfect. The main factor of the item each layer target management in the whole life cycle is complicated and diverse, the information flows the contents abundant, the owner wants to hold tight main antinomy, resolve the key problem, value the contract management is a key. Particularly at join the WTO hereafter, the planned economy is period that kind of superior's will replaces the contract, the human feelings idea is more than the thought of everything, bringing for the engineering construction troublesome and perplexity, more and more take the contract management as the item of the core manages to bring in to raise the item construction of came in the important means of the quantity and performance.Face the new demand that domestic and international building market continuously change, the research that constucts the engineering contract management also got abundant and development, built up the engineering personnels who attend the engineering construction, all the ability manages contract to merge into an integral whole with the item management, the many people still stays around the contract to the contract management to create file to keep up, still not understand contract management substantially be manage item the contents pass the contract body now, pass the contract to be implement to complete effectively, contract management substantially is to take contract as the basal item to manage.
Keywords/Search Tags:item, item management, target management, engineering contract, contract manages, P3E/C
PDF Full Text Request
Related items