| In recent years, increasing pressure on housing, most people obtain a room and tired to run around, but the fact that many people hardly less room to change, so the state has stepped up efforts for the management of housing construction, so great promote the rapid development of construction industry. To meet this new challenge, regional construction companies also have to adjust their management level, actively adopt advanced management techniques, work in the past to avoid the information that appears from time to time mismanagement of funds Zhangmu unclear, confusing, and many work regulations problem. To this end, three construction companies are not far behind in Tianjin, Tianjin, three construction companies into their own management experience, and introduced to computer technology as the core of the management, through a long period of research, and finally design and implement the three construction companies in Tianjin Construction Site Management system, and strive to work the system for the next three built in Tianjin construction site management company to provide maximum help.This article discusses the three construction companies in Tianjin Construction Site Management System for the specific steps the overall implementation process:This article first discusses the development background and research status, that the system is currently the main problems to be solved. Then, in-depth analysis of the overall system requirements, a reasonable division of the system, and a detailed description of each module. Then the system design, the main achievement of the objectives of system analysis, system design and architecture of the system database. Then he carried out the detailed design of the system, on the core functional module involved in the implementation class and implement the process was described, and the technology used in the implementation process was demonstrated. Then study the overall implementation process of the system to show the functional and implementation activities of map rendering, and some of the features announced the implementation code. Final system design process was a brief summary, and prospects of the system are summarized Outlook. System uses a J2EE technology framework for effective integration of the three completed, this system realizes the MVC design pattern, the system closely together at all levels, the system's maintainability and extensibility are the greatest degree of expansion.System to achieve three of Tianjin Construction Site Management Construction Company of the management system, the system is divided into major functional modules:basic information management, materials management, the accounting management, tools, equipment management, statistical information, staff appraisal, they carry out their duties, and close collaboration, have completed the work of the management system.This article is to solve the above problems, the Tianjin Construction Company for the three research objectives, research and development specifically for the three construction companies in Tianjin construction site management system. Strive to make the construction site management has been strengthened, not only to improve construction site management, optimization of management processes, but also reduce the excessive waste of resources. |