Font Size: a A A

Analysis And Design Of Sichuan Electric Power Extra High Voltage Transmission Project Management System

Posted on:2013-11-03Degree:MasterType:Thesis
Country:ChinaCandidate:B XieFull Text:PDF
GTID:2248330371466993Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Twenty-first century China, economy keep the high-speed increase, electric power need develops at top speed, electric power is building one important ring that the basis builds as the country, surely is confronted with more opportunity and challenge with Enel institutional reform going deep into. The Sichuan electric power extra-high tension construction administration company directly subordinates to a company as Sichuan Province electric power company have born the main Sichuan Province electric power construction mission, the construction mission is arduous, urgent need introduces advanced administration thought, makes use of smooth coming to ensure building a mission informationize to be completed. Sichuan Electric Power Extra High Voltage Transmission Project Management System use present information technology and the advanced management concept, for the power transformer engineering service, enhance the project management the efficiency and the quality, enhances the engineering construction security, realizes the power transformer project management informationization and the policy-making solid current events.Research on EHV company’s business needs survey, in Beijing Forever Technology Co.Ltd (Forever Technology) of the IEPIP (IEforever Project Management Integrated Platform) on the basis of design, realizes the transmission the power transmission project management system.To establish the Sichuan Electric Power Extra High Voltage Transmission Project Management System, the following two issues need to be resolved. First, which service function can solve using the IEPIP products, Second, how to carry on the design to outside the IEPIP products’s service.In order to solve the first problem, this paper detailed analysis of the Sichuan Electric Power EHV power transmission project construction and management of construction companies in the whole process of business and other power projects business, conduct needs analysis, can be used to extract a large number of business functions IEPIP products. Electric Power Engineering Construction reported that the trial involves a number of departments and units, by analyzing business processes, the Topics can be used IEPIP products workflow technology to achieve these processes have a fixed trial report.. In a large number of business forms, data analysis, based on the IEPIP products can be used to identify the account in the allocation of technology to achieve dynamic configuration form, save a large part of program development workload. In the demand investigation and study discovered that the user is very high to the statistical returns request, the report format is complex, and is not fixed, the statistical condition and the statistical result field is not fixed, therefore has used based on quick leisurely report form IEPIP the report form. Through IEPIP products effective addressing Sichuan Electric Power Extra High Voltage Transmission Project Management System the larger part function.The second issue is How to carry on the design to outside the IEPIP products’s service. First divides the service into integrated management subsystem, project management subsystem, financial management subsystem, general business subsystem and so on client terminal subsystem, then carries on the detailed work design, including designs and so on system construction, kind of chart, simultaneously discovers between the module the relation.This paper analyzes the final outcome is constructs the Sichuan Electric Power Extra High Voltage Transmission Project Management System for the Sichuan electric power ultrahigh voltage construction management company, this system includes: integrated management subsystem, project management subsystem, financial management subsystem, general business subsystem and so on client terminal subsystem.
Keywords/Search Tags:Extra High Voltage, Power transformer, IEPIP, Client side
PDF Full Text Request
Related items