| In the field of rubber parts manufacturing, the first process of each product to go throughthe beer work on the machine pressed into semi-finished products. In order to mobilize theenthusiasm of the beer Workers, according to the quality and quantity to fulfill customerorders, which need to design a practical, reasonable piece wage system, to establish aneffective incentive mechanism to reflect the fair remuneration for labor, just scienceprinciples, scientific and reasonable arrangements for the production tasks.In this paper, the demand for beer work piece of a large rubber parts manufacturingcompany, and refer to them before hand-piece workflow, according to the guiding ideology ofsoftware engineering, careful study of rational planning, design and implementation of thesystem. Mainly the following aspects of work:1. Designed and implemented order-driven production of automatic scheduling andproduction process tracking methods. To generate production scheduling based on customerorders. Since the difference of delivery date, generate multiple task orders to the workshop,task orders define using machine, mold, production date range, product formulations, etc. Usethe number of task orders to track product flow process.2Designed and implemented standard capacity optimization capacity design andmonitoring. Standard capacity is a normal yield of a worker in the unit hours to produce aproduct with a mold. According to the feedback of actual capacity, the standard capacity canbe monitored and optimized.3. According to the application requirements of the rubber parts manufacturing, thedesign and implementation of the piece wage system, the system includes supplemented bytiming management, delivery order management, wage settlement, multi-angle data analysisreport, semi-finished products warehouse enters sells saves management functions, etc.In the needs analysis phase use case diagram is designed by Microsoft Office Visio2007.In the system design phase PowerDesigner help database design. In development process, useVSS for version management, use Delphi for client development, use eclipse for web design.In test phase use Segue’s SilkPerformer for stress testing.The normal operation of the system actually proved the correctness of the design andimplementation. |