Font Size: a A A

Development Of Managing System Of Xingtai Construction Laboring Service Based On C/S Architecture

Posted on:2013-05-17Degree:MasterType:Thesis
Country:ChinaCandidate:Y H ChenFull Text:PDF
GTID:2248330395970778Subject:Computer technology
Abstract/Summary:PDF Full Text Request
In recent years, along with the acceleration of the urbanization and the rapiddevelopment of the construction industry, the migrant workers team in the constructionindustry is growing rapidly. They not only have become the new force in constructionindustry but also are playing a more and more important role in economic and socialdevelopment. However, the events of wages arrears for migrant workers who work in theconstruction industry enterprises are of common occurrence, which plague all levels ofgovernment and regulatory authorities for a long time. Besides, there are still manyoutstanding issues in the construction industry, such as migrant workers disorderly flow,private recruit abuse, asking for salary maliciously and employment rate with certificatebeing low. It’s not able to prevent and cure the above problems with the traditionalmanagement tools in time.On the basis of the depth research system functional requirements and businessprocesses, applying the C/S three-tier structure,.NET and SQL Server developmentplatform, Xingtai construction labor management system is designed. Applying sets bankmagnetic stripe and chip as one of the dual-media card realizes the overall management ofthe construction industry of Xingtai City including projects, construction contracts,engineering funds, the wage guarantee, units of taking part in the building, workers, laborcontracts, skills training, business flow, attendance information, payroll, obey the laws andkeep faith and so on. In the process of system development, key technologies which areconstruction labor market management process, network system architecture, wages arrearwarning system, the differentiated data synchronization are put great emphasis on. Onemonth and three months wage arrear warning is realized by comparing attendanceinformation which is getting through monitoring system and the wage paying condition.Differentiated data records and synchronized operation are realized by normalizing otheroperations and converted them into corresponding data operation sentences.The system consists of three parts: Server terminal, management terminal andconstruction site terminal. The server terminal is responsible for database storage andbackup; the management terminal is responsible for database storage the specific businessoperations; the site terminal records the site laborers card registering and uploading therecording information.Currently, the system has been put into use and achieved good results. The implementation of this system regulates the recruitment behavior of construction industryand the order of the construction market, which solves the problem of the constructionindustry in arrears and unpaid wages for migrant workers from the source, safeguards thelegitimate rights and interests of the construction labor market parties effectively andimproves the level of management services for government departments. Besides, thissystem is a strong reference on the design of other parts of the construction labor marketmanagement system.
Keywords/Search Tags:Construction labor market, Wages for migrant workers, C/S three-tier, Dual-media card, Wages arrear warning
PDF Full Text Request
Related items